Annual City Improvement Projects

Sidewalk Safety Repair Program & ADA Upgrade
This is an annual program that provides for the replacement of damaged curbs, gutters and sidewalks at various locations. The sidewalk repairs are made by removing and replacing the damaged concrete. This program also includes the installation of curb ramps that are ADA compliant. Construction for this annual program occurs during the Spring. 
 
Slurry Seal Program
As streets begin to show signs of wear and stress cracking, it is important to seal the cracks to keep water from getting into the roadway subgrade material, which will prolong the life of the asphalt concrete pavement. This program would slurry seal existing street surfaces as a preventative maintenance technique used to lengthen the life of the pavement. Construction for this annual program occurs during the Fall.
 
Street Overlay Program
As streets begin to show structural failures, it is important to reinforce these streets with pavement repairs and overlay to reduce the need for pavement reconstruction in the future. This program proves for the placement of a 1-1/2" asphalt overlay on streets that are presently in a deteriorated condition at various locations. Construction for this annual program occurs during the Spring.

Dublin Ranch Street Light Pole Painting Project
This project will consist of repainting the decorative street light poles in the Dublin Ranch Street Lighting Assessment District. Street light poles will be painted in phases and will span over multiple years. The annual project was started in 2011 and will continue on a yearly schedule. Work is scheduled to commence in late Spring or early Summer on an annual basis.